Advanced Concrete for Fast and Durable Pavement Repairs
Rapid Set® Latex Modified Concrete
 
 

 

 

Materials

Mix Design

Mixing

Surfaces

Batching

Placing

Finishing

Curing
Admix

 


RSLMC GUIDELINES

Rapid Set® Latex Modified Concrete

Surface Preparation


Surface should be sound, clean, and free of any laitance that will be detrimental to achieving proper bond. This is generally done with mechanzied equipment such as scarifiers and shot blasters or with high pressure water from hydro-demolition equipment.

Surface Preparation should be done within 24 hours to placing RSLMC.

Immediately prior to placement of RSLMC the clean surface should be thoroughly wetted for a period of not less than 1 hour.