|
Surface should be sound, clean, and
free of any laitance that will be
detrimental to achieving proper bond.
This is generally done with mechanzied
equipment such as scarifiers and shot
blasters or with high pressure water
from hydro-demolition equipment.
Surface
Preparation should be done within
24 hours to placing RSLMC.
Immediately prior to placement of
RSLMC the clean surface should be
thoroughly wetted for a period of
not less than 1 hour.
|